
Proformance Construction is excited to share the transformation this charming farmhouse has undertaken. Originally constructed in 1945, it remained largely untouched until 2022.
Phase 1 of the Modern Industrial Farmhouse consisted of a major structural redesign and reengineering. Walls were removed and structural steel beams were added to allow for a more open concept. Phase 1 also included a kitchen, bathroom and office remodel. Phase 1 was developed and completed with Phase 2 in mind.
Phase 2 began late 2025 and was completed in 2026. This project saw two additions and an expansive porch tying everything together. The primary suite addition includes a two car garage, laundry, primary bedroom with walk-in closet and a spacious primary bath. Through the kitchen you will find the lovely den addition, designed for both privacy and a connection to the outdoors. The large porch with its warm cedar ceiling offers a space to relax and just soak in the sights and sounds surrounding this lovely property and the creek below.
3
BEDS
2
BATHS
2,300
SQ. FT.
BUILDER:
Home Sub-Contractors
Thank you to our LABA Member sub-contractors who made this home possible!




















